Solutions

Battery Energy Storage Solution

The Telelink Infra Services product – TIS-BESS – is a fully developed local battery energy storage system in a containerized design. The TIS-BESS is designed to store up to 1.50 MWh in a 20″ HC size container, offering space for the battery inverter along with everything needed for normal system operation. Discharge times range from 2 to 4 hours, and the system can be used for grid balancing, peak load reduction, and energy arbitrage.

icon

Scroll down

Battery Energy Storage Solution hero image