Empowering the Energy Transition: Telelink Infra leads strategic battery storage workshop

From Design to Commissioning: EPC-Led Deep Dive into BESS for Financial Stakeholders
A Comprehensive Technical-to-Practical Lifecycle Walkthrough

This week Telelink Infra led a high-impact workshop focused on the current landscape and future evolution of large-scale Battery Energy Storage Systems (BESS). The session brought together key stakeholders to explore infrastructure readiness, technical design, risk management, and the strategic deployment of battery storage in the energy transition.

Bridging Expertise with Strategy
As the driving force behind the event, Telelink Infra reinforced its position not only as a reliable infrastructure partner, but also as a thought leader shaping the path to energy decarbonization. With extensive expertise in grid integration, infrastructure engineering, and project delivery, Telelink Infra continues to lead innovation in smart, resilient energy systems.
The workshop offered a deep dive into the end-to-end lifecycle of BESS projects — covering both colocated and standalone configurations, inverter and EMS compatibility, battery degradation modeling, and financial use cases such as arbitrage, peak shaving, and participation in balancing markets. Discussions also included CAPEX/OPEX benchmarking, ESG obligations and sustainable end-of-life battery management.

UBB: Enabling Collaboration and Long-Term Impact
Hosted by UBB, the event fostered an atmosphere of strategic alignment and knowledge sharing. UBB’s commitment to education and stakeholder engagement sends a clear message: the long-term success of clean energy in Bulgaria depends on continuous learning, institutional collaboration, and building investor confidence through transparency and shared understanding. Their efforts directly support sustainable project development in Bulgaria’s evolving clean energy market.

IPS: Technical Leadership and Industry Insight
IPS brought over 35 years of technical excellence to the table, offering valuable insights into battery storage system design, lifecycle management, operational modeling, and regulatory preparedness. From technology selection to EMS integration and market participation, IPS provided a clear, experience-backed and in-depth technical knowledge roadmap for successful BESS implementation.

Marsh McLennan: Precision in Risk and Insurance Strategy
Global professional services leader Marsh McLennan contributed critical knowledge on the insurance and risk aspects of BESS infrastructure. Their expertise clarified the key risks during procurement, construction, and operations, and introduced tailored insurance strategies designed to enhance investor confidence and ensure long-term project bankability.

A Defining Moment for Bulgaria’s BESS Sector
The workshop marked a significant milestone in the development of Bulgaria’s battery storage ecosystem. Through strategic collaboration and deep technical engagement, Telelink Infra and its partners underscored the importance of coordinated execution and cross-sector understanding in delivering complex energy projects.
At Telelink Infra, we remain committed to leading the charge in building the infrastructure of the future — empowering the energy transition with vision, expertise, and unwavering execution.